TARA L THOMAS 8430
Streamview Dr. Apt. E Huntersville,
NC28078 724-462-5600
– Cell E-mail
– tara.thomas01@yahoo.com CURRENT AS OF: 01/2016 OBJECTIVE To obtain a position as a Project Scheduler
and utilize previous work experience and training obtained through Artemis
ProjectView and/or Primavera P6 Scheduling. EDUCATION 2010 Community
College of Beaver CountyMonaca, PA Associates’
Degree – General Studies Specialization:
Computers
2008 Simplex GroupPittsburgh, Pa Primavera
Project Management with P6: Basic Module - Certificate 2008
Simplex Group Monroeville, PA Primavera Project Management with P6.1: Advanced Module
for Project Managers – Certificate 2009Simplex
GroupPittsburgh, Pa Primavera
Project Management with P6: Basic Module - Certificate
Hopewell Senior High School
Aliquippa, PA Diploma
- 2000 EMPLOYMENT HISTORY 10/2015 to 01/2016 Gaea Global
Technologies Charlotte, NC Google - Gfiber Primavera Project
Consultant Charlotte Gfiber -
Telecommunications · Performed extensive validations on 23 construction
projects, totaling 15,960 activities on a weekly basis. ·
Updated 10 Control projects including - Planned Units, Planned Cost and
Actual Cost. ·
Imported XML files from the customer to our P6. ·
Performed analysis on 23 schedules for open ends, invalid
constraints (invalid per the contractual guidelines), out of sequence
activities, invalid progress within the activities. ·
Participated in one on one interaction with the customer
regarding P6 schedules. ·
Created a 5-8 page Executive Summary on a weekly basis
showing detailed information which included a 3 week look ahead, Critical
Activities, Cost, Payment Milestones, Upcoming Payment Milestones (2 weeks),
Resources and Materials. ·
Received Monthly baselines and performed analysis to
ensure the customer was within the contract. ·
Created baselines on a weekly basis and compared to the
current dates. ·
Other Functions within P6 include: Summarizing projects
and storing period performance. 03/2014 to 10/2015 ESG, Int.
Huntersville, NC McGuire Nuclear Station Work Control – Project
Scheduler FUKUSHIMA PROJECT · Participated in scheduling efforts for the Fukushima
Upgrade Project using Artemis ProjectView (PV). · Lead Schedule
reviews for all 22 EC’s for U1 and U2 upgrades, including task durations,
resources amounts, predecessors and successors, outage windows, sequencing,
calendars. · Understands
and utilizes Nuclear Asset Suite (NAS) to download crew schedules
and work order tasks. Read work orders for logic scheduling purposes. · Download
tasks into PV from NAS. · Maintain
tasks for online work schedules in PV · Work
closely with crew supervisors, project managers, engineering, and project
planners for logic sequencing, schedule building and schedule
maintenance. · Participate
in team/project meetings · provided
re-fueling outage support for MMP outage scheduling · Reviewed
Resource Histograms on resource leveling for outage crews. · provided
daily/weekly schedules in Microsoft Excel for the project team. · Provided burn-down data for
burn-down curves used by management for man hours and schedule
progress/issues.
02/2011 to 2/2014 ESG, Int.
Huntersville, NC McGuire Nuclear Station Implementation Scheduler –
McGuire Major Projects · Gained experience in Artemis ProjectView (PV)
as a scheduling tool on a daily basis. · Understands
and utilizes Nuclear Asset Suite (NAS) to upload schedules and
read work orders for scheduling purposes. · Load
tasks into PV from NAS. · Maintain
tasks for online work schedules in PV · Builds
logic diagrams in Primavera P6 for online projects ·
Works with crew supervisors for task support, if needed ·
Participate in team/project meetings · Provided
outage support for MMP outage scheduling · Move tasks
from MMP hold projects to MMP schedules · Work with
IM’s to build logically tied Implementation schedules 03/2009 to 01/2011 Ansaldo STS, USA
Pittsburgh, PA Project Planner · Developing
and maintaining logically integrated engineering, manufacturing, and
Installation
schedules.
· Exporting
skills from Primavera P6.2 to Primavera P3.1. Modify Primavera
P3.1 to meet customer expectations. · Importing
skills from Microsoft Project into Primavera P6.2. ·
Developed Baseline schedules to track the variance from the
beginning to the end of the project. ·
Developed Proposals for future work. ·
Perform bi-weekly and/or monthly updates to track project costs and
performance on the project. ·
Analyze critical paths for the project team. ·
Complete Customer Submittals according to the project specification. ·
Perform one-on-one customer calls and face to face meetings on-site. ·
Resource load all project schedules, including units, costs and track them
on a monthly basis. ·
Prepare costs to complete on a quarterly basis for the project team as
well as management. ·
Project Experience: -
Shanghai Line 2 EE-WWE -
Shenyang Line 1 -
Chengdu Line 1 -
Shenyang Line 2 -
Xi’an Line 2 -
Hangzhou Line 1 -
PATH – Port Authority Trans Hudson 08/2008 to 03/2009 High Bridge Associates, Inc.
Westinghouse
Energy Center - Nuclear Division AP1000 Projects
Monroeville, PA Planning Specialist – Nuclear Engineering Projects ·
Planning and Scheduling for AP1000 Projects including Engineering
Schedules, Domestic and China Projects. ·
Scheduled using Primavera P5 until the transition of Primavera P6.1
took place. ·
Participated in the China Recovery Plan and Schedule Integrity Issues
for maintaining Instrumentation and Control Systems (I&C). ·
Issued/created reports for Leads and Managers on Daily Reporting for Schedule
Integrity Issues using Microsoft Excel; including Data Date Riders, Open
Ends, and Out of Sequence Activities for China Specific Projects, Domestic
Projects and the Engineering Project. * Excel –
Pivot Tables, Vlookups, Charts,
Graphs,
Tables. ·
Built the Inspections, Test, and Analysis Acceptance Criteria Schedule
(ITAACS) from the EPS (Enterprise Project Structure) to a total of 1,609
activities to prepare ITAACS to be linked out to Domestic Projects, as well
as working closely with the NRC. ·
Consistently updates the ITAACS Schedule for monthly NRC meetings. ·
Conducted a training workshop of 26 people regarding the ITAACS, including
but not limited to; topics discussed was a sample schedule, ITAACS facts,
project specific activity codes, notes to resources, links, NRC facts. ·
Completed Schedule Change Proposal’s and 4-week Look Ahead reports for
weekly/daily Schedule updates. ·
Worked on the most complex Schedule in the world; the AP1000 Engineering Schedule
currently has 16,000 activities. ·
Completed the Introduction to PWR (pressurized water reactor) training
course. 07/2003 to 08/2008 Balboa Life and Casualty
Insurance Company Outbound Customer Service Rep. Coraopolis,
PA 05/2002 to 05/2003 Kaufmann’s Department Store,
Inc Sales
Associate Robinson, Pa 07/2000 to 05/2002 Pizza Hut Corporation Waitress Aliquippa, Pa PERSONAL
SKILLS · Ability to
quickly adjust to a new environment and required skill levels. · Effective
working alone or in a team environment. · Exceptional
ability to quickly master new work assignments. · Eager to learn
new skills. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|